
Hotel in Clerkenwell

Project
Information
ClientPrivate Owner
LocationClerkenwell, London, UK
Project DateJune 11, 2026
Project StatusCompleted
Budget£500,000.00
Project Vision Statement
Situated in the vibrant office district between King's Cross, Farringdon, and Holborn, this former office building had been vacant for over a decade, falling into a state of disrepair. However, this project aimed to revitalize the structure through a comprehensive renovation, unlocking its significant potential.
We have been tasked with transforming the building from an office space into a contemporary boutique hotel. Our client's business plan stipulates a minimum of 43 rooms to ensure a swift return on investment.
Challenges
- Maximizing the number of rooms within a relatively constrained space
- Achieving a 'Very Good' BREEAM rating in line with hospitality legislation
- Ensuring soundproofing for all rooms (1870 building structure with acoustic flanking)
- Building energy optimization and intelligent controls
Solutions
- Relocated internal staircase to rear lightwell, freeing up additional space for more rooms across six floors.
- Prioritized local suppliers to minimize the overall carbon footprint during construction.
- Added extra layer of insulated material and conducted rigorous acoustic testing to meet standards.
- Integrated automated system switching off HVAC and lighting when rooms are unoccupied.

